ROLL-OFFCONTINUING
WITH REACTOR LEAVING SHIP
AND MOVING ONTO
SPECIALLY PREPARED RAMP.
450TONNES VACUUMTOWER
BEING OFFLOADED FROM SHIPS
CRANES TO OUR TRAILER
FOR ONWARDTRANSPORTATION TO THESITE.
ANOTHERVACUUM TOWER
650 TONNES 14 METRES WIDE
BEING LOADED ON BOARD SHIP
PRIOR TO ROLL-OFF ACTIVITIES.
183TONNES
CO-OXYDISER. ON IT'S WAY
FROM SEAPORT
TO JGC/STAR PROJECT SITE
DIFFERINGVIEWS OR 455 TONNES
CRUDE COLUMN NEGOTIATING
VARIOUS ROAD JUNCTIONS ON
IT'S WAY TO SITE
AERIALVIEW OF 450 TONNES
VACUM TOWER
IN MAPTAPHUT
SEAPORT.
REACTORNOW ON RAMP
AND PROCEEDING INTO
FINAL OFF
LOADING PHASE.
155TONNES BOILERS
ENROUTE FROM THE SEAPORT
TO THE JGC/STAR PROJECT
SITE IN CONVOY ASHION.
650TONNES VACUUMTOWER
ARRIVING ON SITE
AT JGC/STAR
REFINERY SITE.