ROLL-OFFCONTINUING

      WITH REACTOR LEAVING SHIP

      AND MOVING ONTO

      SPECIALLY PREPARED RAMP.

          450TONNES VACUUMTOWER

          BEING OFFLOADED FROM SHIPS

          CRANES TO OUR TRAILER

          FOR ONWARDTRANSPORTATION TO THESITE.

      ANOTHERVACUUM TOWER

      650 TONNES 14 METRES WIDE

      BEING LOADED ON BOARD SHIP

      PRIOR TO ROLL-OFF ACTIVITIES.

          183TONNES

          CO-OXYDISER. ON IT'S WAY

          FROM SEAPORT

          TO JGC/STAR PROJECT SITE

      DIFFERINGVIEWS OR 455 TONNES

      CRUDE COLUMN NEGOTIATING

      VARIOUS ROAD JUNCTIONS ON

      IT'S WAY TO SITE

          AERIALVIEW OF 450 TONNES

          VACUM TOWER

          IN MAPTAPHUT

          SEAPORT.

      REACTORNOW ON RAMP

      AND PROCEEDING INTO

      FINAL OFF

      LOADING PHASE.

            155TONNES BOILERS

            ENROUTE FROM THE SEAPORT

            TO THE JGC/STAR PROJECT

            SITE IN CONVOY ASHION.

      650TONNES VACUUMTOWER

      ARRIVING ON SITE

      AT JGC/STAR

      REFINERY SITE.

          C3SPLITTER COLUMN

          IN TEMPORARY STORAGE

          ON TRAILERS

          AWAITING TRANSPORT TO SITE.